BRPL USA | 50th ANNIversary

Intercontinental Boston


Lobby Level

Stone Wall | Escalator


Floors 2 & 3

Branding | Pre-Function | The Journey


Concert | Stage Branding | Audio Visual

Creating Impact | Merging the Brand with the Entertainment Experience


Example Furniture Layouts

Our team will work with you and your team on a Rose Kennedy floorplan based on your input


GRAPHIC SPECS


Project Pricing (Menu):

Lobby Level (Branding Options)

  • Stone Wall (Set of 3 impact graphics) @ $1,550 each | $4,500 total

  • Stone Wall (Set of 1 impact graphics) @ $1,550 each

  • Freestanding Branded Structure @ $950 each

  • Escalator Bands (8) - Floors 1-2 @ $250 each - $2,000 Total

  • 18” Escalator Circles (8) - Floors 1-2 @ $65 each - $520.00 Total

Floor 2 (Branding Options)

  • Escalator Hanging Sign (2-sided) - $1,350

  • Art Overlays 1 (Abigail Adams Foyer) @ $1,450 each

  • Art Overlays 2 (Abigail Adams Foyer) @ $1,250 each

  • Freestanding Branded Structure(s) @ $950 each

  • Applied Window Graphics @ $65 each

  • Digital Kiosks with Branding @ $1,050 each

  • Registration Counter with Branding (Full face) @ $1,500

  • Wood Wall Art @ $125 each | $875 total (Example of 7)

  • Escalator Bands (12) - Floors 2-3 @ $250 each - $3,000 Total

  • 18” Escalator Circles (8) - Floors 2-3 @ $65 each - $520.00 Total

Floor 3 (Branding Options)

  • Art Overlays 1 & 2 (Rose Kennedy Foyer) @ $1,350 each

  • Art Overlays 3 & 4 (Rose Kennedy Foyer) @ $1,250 each

  • (6) Window Graphics (Rose Kennedy Foyer & Rose Kennedy Ballroom) @ $65 each

  • Digital Kiosks with Branding @ $1,050 each

  • Wood Wall Art @ $125 each | $875 total (Example of 7)

  • Soffit Graphic @ $3,840 (48 linear feet)

Communal Table/Charging Stations

  • Communal Table/Charging Stations (With branding on charging surface) @ $1,050 each

  • Communal Table/Charging Stations @ $900 each

  • Stools (These can be stand up tables or utilize stools) @ $125 each (Typically 4 per table)

Furniture (We can provide a quote when we determine scope/approach)

Logistics (We can provide a quote when we determine scope/approach)

  • Project Management, Pull & Prep, Install/Dismantle, On-Site Supervision, Delivery to Site $TBD - $TBD